Demolition Company in Dubai

AL MROOJ INSIGHTS

Demolition Work in Dubai: Process from Survey to Handover

Demolition work in Dubai needs careful planning at every stage. The building, site access, nearby properties and work being requested all affect how the job should be done. This guide explains the process from the first site survey to the final handover.

What Is Demolition Work?

Demolition work,it is the planned removal of a building or part of a building. It may include walls, floors, roofs, foundations, pipes or other structures. The work can be full or partial.

The scope should clearly say what will be removed and what must stay. That helps the project team choose a suitable demolition work method and plan for the site.

Survey the Site and Agree on the Scope

Before work starts, the project team visits the site and checks the building, access routes and nearby areas. Available drawings can help, but the team also needs to consider the building’s current condition.

The survey helps the team identify:

  • The parts to be removed and the parts to remain
  • The building materials and visible damage
  • Nearby buildings, roads and working areas
  • Access for workers, tools, machinery and waste vehicles
  • Pipes and services that may need to be checked or protected

The client and contractor should agree who will arrange each check, approval and service disconnection. Requirements can vary by location and project.

For  more service enquiries, see Al Mrooj’s robotic demolition services.

Preparing a BOQ for Demolition Works

A bill of quantities (BOQ) helps describe and price the agreed work. A BOQ demolition works sample might include separate lines for wall removal, floor removal, pipe removal, waste handling and site clearing. It should describe the work clearly and use quantities based on the project information.

A demolition of piping works description in a BOQ should state which pipes are included, where they are located and how they will be handled. The BOQ should also make clear what is excluded. It is a project pricing document, not a demolition method statement.

Prepare the Method Statement and Risk Assessment

A method statement of demolition works explains how the agreed work will be carried out. It should describe the work order, equipment, site controls and how workers will move around the work area. A demolition work method statement must match the actual site and scope. A risk assessment for demolition works identifies hazards and the steps planned to control them. Common hazards include falling materials, unstable walls, moving machinery, dust, noise and hidden services. For example, a risk assessment for demolition works of a block wall should consider whether the wall could fall in an unsafe direction. The team should check what supports it and plan a controlled way to remove it. A method statement template of demolition works can help with document layout, but it should not be copied without review. Each project needs documents that match its own building and work plan. The HSE plan for demolition work should also fit the project’s risks and emergency arrangements.

Set Up the Site Safely

Before demolition begins, the team prepares the work area. This may include access controls, barriers, warning signs and agreed routes for machinery and waste.

A demolition work in progress sign warns people that work is taking place. Demolition work safety signage should be easy to see and understand. Where Arabic signs are needed, the message should be checked so it is clear to Arabic-speaking workers and visitors too.

Demolition work at height needs extra planning. The team should check how workers, tools and materials will be kept safe while work takes place above ground level. The right controls depend on the structure and the task.

Carry Out the Demolition in Planned Stages

Once the required checks and site preparations are complete, the team follows the agreed sequence. Demolition works tools and materials depend on the building and the method selected. They may include hand tools, cutting tools, machinery and equipment for moving materials.

The team should keep the work area controlled as the structure changes. If the site condition or work scope changes, the responsible project team should review the plan before the work continues.

During demolition, the team sorts materials under the agreed waste plan. Concrete, steel and other materials may need different handling. The final waste route and records should follow the project requirements.

Check the Work and Handover the Site

After the agreed work is complete, the team checks the area against the scope. The handover should state what has been removed, what remains and whether any agreed site clearing or other work is finished.

The client and contractor should also confirm the records required for close-out. These may include project documents and a certificate of final completion for demolition works, where required for that project.

For property owners comparing companies that do demolition work in Abu Dhabi or Dubai, a clear scope, a site-specific work plan and an agreed handover condition help make proposals easier to compare. Al Mrooj’s team can discuss demolition works in the UAE according to the project location and scope.

Can the machine reach the work area?

Check the full route, not just the entrance gate. A machine may pass through one doorway but fail to turn in the corridor beyond it.

Ask about door widths, headroom, ramps, loading areas and delivery access. If a lift or hoist is proposed, its limits and use must be checked too.

For example, Brokk lists a minimum width of 780 mm for its 170+ model. Its listed machine weight is 1,600 kg, without options or the attachment. Those figures apply to that model. They do not prove it will fit or suit your property.

Frequently Asked Questions

What is the process for demolition work?

The process usually includes a site survey, scope agreement, project planning, site preparation, demolition, waste handling and handover. The exact steps depend on the site and the work involved.

What should a BOQ for demolition works include?

It should describe the agreed removal tasks, quantities where available, waste handling and any included site clearing. The project team should also confirm what is excluded.

Is one safety plan suitable for every demolition project?

No. The plan should reflect the building, work area, demolition method and risks involved.

Ready to Start Your Project?

Discuss your Demolition work with Al Mrooj

For demolition work in Dubai, Al Mrooj’s team can discuss the project from the first site survey to final handover. The client can share the property location, available plans or photos, and details of what needs to be removed or kept. This helps the team understand the scope and discuss suitable next steps.

Contact Al Mrooj to discuss the assessment and approval coordination relevant to your project.